EPS@ISEP | The European Project Semester (EPS) at ISEP

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revisionPrevious revision
Next revision
Previous revision
log [2014/06/18 12:54] – [7th Meeting (2014-04-30)] team2log [2014/06/18 16:22] (current) – [13th Meeting (2014-06-12)] team2
Line 181: Line 181:
  
 Arduino : Arduino :
-  * Input voltage (recommended)           7-12V +  * Input voltage (recommended)           7-12 V 
-  * Input voltage (limit)                 6-20V +  * Input voltage (limit)                 6-20 V 
-  * Operating Voltage                      5V +  * Operating Voltage                      5 V 
-  * DC Current   per I/O Pin              40 MA +  * DC Current   per I/O Pin              40 mA 
-  * DC Current for 3.3V Pin               50 MA+  * DC Current for 3.3V Pin               50 mA
 -This pin outputs a regulated 5V from the regulator on the board. -This pin outputs a regulated 5V from the regulator on the board.
  
Line 236: Line 236:
  
  
 +**Minute:**
 +
 +ΔT that is inside of the cork was tried to calculate but was agreed to use temprature stick to measured the ΔT because of the diffculties that is to calculate. power consumption was tried to calculated and the doubts were argued.
 ==== 9th Meeting (2014-05-15) ==== ==== 9th Meeting (2014-05-15) ====
   - what do you expect from our project? we need spesific answers because of the project management.   - what do you expect from our project? we need spesific answers because of the project management.
Line 242: Line 245:
   - Estimation of the autonomy   - Estimation of the autonomy
 https://drive.google.com/file/d/0BxN1665smBF_WTZmREVVUXNxUGc/edit?usp=sharing https://drive.google.com/file/d/0BxN1665smBF_WTZmREVVUXNxUGc/edit?usp=sharing
-==== 10th Meeting (2014-05-15) ====+ 
 +**Minute:** 
 +expectation of the project manaegment was asked to supervisors. fritzing diagram  of the prototype was shown and estimation of the autonomy was calculated and shown. 
 +==== 10th Meeting (2014-05-22) ====
   - Estimation of the autonomy(corrected) https://drive.google.com/file/d/0BxN1665smBF_dDFkc0lNTmM2WTg/edit?usp=sharing   - Estimation of the autonomy(corrected) https://drive.google.com/file/d/0BxN1665smBF_dDFkc0lNTmM2WTg/edit?usp=sharing
   - Power diagram    - Power diagram 
Line 252: Line 258:
 {{:signaldiagram.jpeg?300|}} {{:signaldiagram.jpeg?300|}}
  
 +**Minute:**
 +
 +Estimation of the autonomy was corrected by supervisors. Afterthat, power and signal diagram has shown. the proposal of the software solution was shown to supervisors and some feedback was gotten.
  
 ==== 11th Meeting (2014-05-28) ==== ==== 11th Meeting (2014-05-28) ====
Line 266: Line 275:
   -  Start saving data in the SD card   -  Start saving data in the SD card
   - Developed and android app   - Developed and android app
 +  - 
 +**Minute:**
 +
 +We had some priorities before meeting. At the meeting, we asked that which priorities are more important than the others. The most important one is to make it work by USB maybe after to make it work by bluetooth and accroding to the answers we were start to work on them.
 +
  
 ==== 12th Meeting (2014-06-05) ==== ==== 12th Meeting (2014-06-05) ====
Line 271: Line 285:
   - what is the deadline of the paper?   - what is the deadline of the paper?
   - which part of report do we suppose to consider for paper?   - which part of report do we suppose to consider for paper?
 +
 +**Minute:**
 +
 +Structure of the paper was asked to supervisors and they have explained us. ıt should be consider state of the art, project devlopment but also we should mention about (not much) marketing and sustainability.
 +
 +
 +==== 13th Meeting (2014-06-12) ====
 +  - show the visual interface in computer
 +
 +**Minute:**
 +
 +Last version of prototype and  the visual interface were shown in the last meeting and gotten some feedback. the supervisors recomended us to think about aerodynamic of device on the board. Also, they informed us that we have a meeting on 23th june with IT Sector( the company that provided us the materials).
 +
 +
 +
 +
 +
 +
 +
 ===== Activities ===== ===== Activities =====
 //Please register here all project activities// //Please register here all project activities//
QR Code
QR Code log (generated for current page)